Training Course

 Home / Profile / CIEET Course

CIET – Certified Industrial Electrical Engineer Trainee

Eligibility : BE (EEE)

Duration : 90 days (720 hours) – Full time

Theory:
  •   Hygiene, Safety & environment & soft skills
  •   Electrical Fundamentals & Basics , IE Rules & KAHRAMAA Standards
  •   Power measurements
  •   Cable Glanding and terminations
  •   Batteries and chargers
  •   Lighting & Illumination
  •   Conductors & insulators - Wires & Cables
  •   Basic motors principle & Wiring Methods & accessories
  •   Tray and Trunking
  •   HT Breakers
  •   Electrical Protection
  •   AC/DC Generators & Motors
  •   Motor Maintenance Concepts
  •   Transformers
  •   Transformer Maintenance Concepts
Practical:
  •   Power tools & Hand tools - Practice
  •   Cable Tray - Cutting Practice
  •   Fabrication of Vertical Inner Bend
  •   Fabrication of Vertical Outer bend
  •   Fabrication of Horizontal Bend
  •   Fabrication of Eccentric Reducer
  •   Fabrication of Equal Reducer
  •   Fabrication of Tee
  •   Cable Glanding & Termination & Dressing
  •   House& Industrial wiring Practice - Ring & Radial &Fixing of JBs & PDBs.
  •   Wiring of DOL, Forward/Reverse, Star/Delta circuits
  •   GI Conduit making - 90 degree, Single & Double bridge
  •   Cable laying ,dressing, & series parallel connection
  •   Insulation Testing Practice & Loop test, functional test
  •   BOQ , BOM, MTO
  •   Reading Electrical Drawing
  •   Building Estimation Costing
  •   Pre Testing & Commissioning Report
  •   Preparation Of Cable Schedule doucmentation
  •   Study Of Equipment Location drawing [Plan & Elevation]
  •   Installation Of Panel Board Supports
  •   Earthing ,Types And Cad Welding
  •   Panel wiring
  •   BOQ , BOM , MTO
  •   Reading Electrical Drawing
  •   Building Estimation Costing
  •   Pre Testing & Commissioning Report
  •   QA / QC
  •   RFI – Request For Inspection Preparation
  •   Preparation Of Cable Schedule doucmentation
  •   Study Of Equipment Location drawing [Plan & Elevation]
  •   Installation Of Panel Board Supports
  •   Earthing , Types And Cad Welding
  •   Generation And Transmission
  •   Transformer Types , KVA Calculation
  •   Generator & Transformer Synchronizing
  •   UPS And Types & Batteries
  •   HVAC Basics
  •   Internal / external lighting systems and lighting control panel
  •   Medium Voltage Panels (MV Panels) and Main Distribution Boards (MDB)
  •   Sub Main Distribution Board (SMDB) and Distribution Boards (DB's)
  •   Emergency Panels and Central Battery System
  •   Motor Control Centre (MCC) and Control panels (CP)
  •   Small Power Outlets (sockets, isolators, etc.)
  •   Lightning Protection
  •   Earthing System
  •   ELV System
  •   Diesel Generators
  •   BMS Systems
  •   Power Busbar Systems
  •   Fire Alarm Systems
  •   HV Switchgear and Transformer
  •   VFD Parameter Setting
  •   Configuration and Testing of DI,DO,AI,AO
  •   PLC Programming - Allen Bradley
  •   PLC Programming - Delta
  •   PLC Programming - Siemens
  •   PLC Programming - Horner
  •   Configuration of HMI - Allen Bradley
  •   Configuration of HMI - Delta
  •   Configuration of HMI - Siemens
  •   Configuration of SCADA - Factory Talk View
  •   Configuration of SCADA - Envision RV
  •   Generation, transmission & distribution
  •   Industrial all Panel board wiring practice (MCC, PDBs, LCS, Communications. Etc.,)
  •   AC motor: no-load run, no load characteristic curve measure, mechanical characteristic curve measure, efficiency measure, rotate speed measure, locked rotor experiment.
  •   Jogging and self-locking control circuit of three-phase asynchronous motor.
  •   Positive and negative rotation of three-phase asynchronous motor
  •   Y-Δ reduced voltage starting control circuit or three-phase asynchronous motor
  •   Reverse braking control of three-phase asynchronous motor
  •   Control circuit of double-speed asynchronous motor
  •   Circuit control at two different places of three-phase asynchronous motor
  •   Three Phase Asynchronous motor run and stop experiment controlling by single button.
  •   Meets the counter- three phase lines to control the three phase asynchronous motor experiment
  •   Three phase asynchronous motor timing revolving control experiment
  •   Breaker control and signal circuit experiment
  •   Three-phase asynchronous motor direct starting circuit.
  •   Three-phase star-delta starting automatic control circuit.
  •   Three-phase asynchronous motor contactor interlocking reversible rotation control circuit.
  •   Three-phase asynchronous motor contactor and button double interlocking reversible rotation control circuit.
  •   Control circuit of asynchronous motor and time relay controls Y and Δ circuit.
Transform Knowledge to Skill